To address this challenge, the PK SPACES team implemented a strategic Value Engineering (VE) process focused on optimizing costs without compromising aesthetic integrity or long-term durability. Partnering closely with the Merlin Entertainments team, PK SPACES led the custom fabrication of a wide range of bespoke, theme-driven furniture pieces engineered to support both the creative intent and the operational demands of high-traffic hospitality spaces.
DESIGN
Develop and fabricate brand-aligned, themed furniture that adhered to Legoland’s creative vision and Merlin’s quality standards.
SAFETY
Ensure structural integrity and safety compliance, especially for interactive and kid-centric pieces.
ALIGNMENT
Develop and fabricate brand-aligned, themed furniture that adhered to Legoland’s creative vision and Merlin’s quality standards.
DELIVERY
Maintain quality while responding to urgent logistics challenges tied to installation deadlines.
OUR APPROACH
- Solid MDF and hardwood frames were used for strength and precision shaping.
- High-performance laminates and non-toxic paints were applied to achieve the brand’s vibrant color palette.
- Embedded LEGO motif details and custom CNC patterns were incorporated for immersive storytelling.
KEY SUCCESS FACTORS & RESULTS
- Compressed lead times threatened project delivery.Solution: Air freighted all furniture components internationally to meet fixed opening schedules.
- Maintaining structural integrity in highly customized designs.Solution: Reinforced joinery, CNC precision routing, and internal steel supports for durability.
- Balancing cost with brand accuracy.Solution: Material engineering using cost-effective substrates while achieving premium visual finishes
Metric | Goal | Outcome |
Design Alignment | Match Legoland’s brand aesthetic | Achieved through custom color, form, and detailing |
Safety & Durability | Hospitality-grade compliance | Exceeded ASTM standards |
Delivery Deadline | Pre-opening installation | Met, despite shipping constraints |
Air Freight Cost | N/A | $200,000+ incurred to meet deadlines |
| Client Satisfaction | On-time, on-brand execution | Achieved 100% installation acceptance |
THE OUTCOME

